All the formations can be formed from Worsley Works Kits in 2mm and 3mm Scale
For more information try the Southern Railway e-mail Group
Link provided by Worsley Works 'Backing the Future of 3mm Scale
SOUTHERN RAILWAY/SOUTHERN REGION COACH SETS |
||
The Southern Railway built many of its
coaches to run in sets as follows:- |
||
Five Coach Sets | Four Coach Sets | Three Coach Sets |
Semi-Open Brake Third | Semi-Open Brake Third | Semi-Open Brake Third |
Corridor Third | Corridor Composite | Corridor Composite |
Corridor Composite | Corridor Third | Semi-Open Brake Third |
Corridor Third | Semi-Open Brake Third | |
Semi-Open Brake Third | ||
Corridor Brake Composite D2405 would have been used in the two coach sets D2406 was designed for loose working with as many as seven included in the Atlantic Coast Express | ||
The Maunsell Coaches ran in the same formations as above
with a Corridor Brake Third replacing the The Following additional formations were also used:- |
||
Six Coach Sets | Six Coach Sets | Five Coach Sets |
Corridor Brake Compo | Corridor Brake Third | Corridor Brake Compo |
Corridor Third | Corridor Third | Corridor Third |
Corridor Composite | Corridor Composite | Corridor Composite |
Corridor Composite | Corridor Composite | Corridor Third |
Corridor Third | Corridor Third | Corridor Brake Compo |
Corridor Brake Compo | Corridor Brake Third | |
Two Coach Sets | Four Coach Sets | |
Introduced 1959 | Corridor Brake Third | |
Corridor Brake Compo | Corridor Composite | |
Open Second | Corridor Composite | |
Corridor Brake Third |